Menu

Network Techlab (I) Pvt.Ltd. installed the 4×4 Video wall in the corporate area and thus enabling the employees to gather all the informative display on a single high-quality screen.

Times Square Ajmera group took a giant leap towards technical modernization by installing the cutting edge, best in class “Video wall”.

logo

Organisation
Times Square – Ajmera Group

Location
Andheri – Kurla Rd, Gamdevi, Marol, Andheri East, Mumbai, Maharashtra 400059

Domain
A Corporate Destination

Solution Offered
4×4 Video wall

Overview
Owing to its timeless style of creation and strategic location, Times Square provides a perfect launching pad for all businesses.Times Square has been designed keeping international standards in mind, giving businesses ample opportunity to thrive in an invigorating global ambiance.

An Eco-tech commercial marvel par excellence spread across approx. 6.5 acres of land, Times Square has gained the stature of gold-rated LEED certified private IT Park Defining the new-age genre of business parks, its features in true sense uphold a new dimension of corporate growth. Andheri (E). It’s the business hotspot in India’s capital of business, Mumbai. To anchor your establishment at this location is synonymous to enjoying a pole position. And when you have the luxury infrastructure offered at the doorstep along with it, the advantage is simply doubled.

Times Square benefits from this special privilege of being situated at Andheri (E), a strategic place immaculately connected via every mode of transport. Adding to that the hospitality and entertainment avenues in the vicinity.The location of Times Square is distinguished.

Challenges
• Increase in cost of printing due to wastage of paper.
• Occupying more space and usage of multiple machines resulting in a clutter.
• Unauthorised users causing mismatch in the paper usage
• Difficulty in servicing number of machines.

Why there was a need to innovate
NTIPL proposed a 4 X 4 video wall i.e. total 16 screens. The purpose of this innovation in the corporate area was Deliver engaging, interactive multimedia presentations. Collaborate with remote colleagues and share information site-to-site. Create a high-impact digital canvas to reinforce brand identity and welcome visitors.

What were the challenges faced during the resolution of the complication
There was two type of installation one is hardware installation and one is software installation. At the time of software installation, the software was not supporting the run out content and it was taking too much time to resolve because of the approval dependency from the OEM.

How was the issue/complication resolved

The customer was escalating as they were on a tight schedule. After careful deliberations, we came to an agreement that this issue needed more time to be resolved.

Conlusion
As per the requirement of the customer we were able to install the 4 x 4 Video wall in the corporate area and thus the employees are now able to watch all the informative presentations on a single high-quality display. Also, the requirement of entertainment for the employees is now sorted as the business broadcasts certain sports on the video wall.

Logo

Network Techlab (I) Pvt. Ltd.
41, Sarvodaya Industrial Estate, Opp. Paper Box, Off. Mahakali Caves Road, Andheri East, Mumbai – 400093. India
www.netlabindia.com | 022-66814101 | info@netlabindia.com
Mumbai | Navi Mumbai | Ahmedabad | Vadodara | Vapi | Pune | Bangalore | Chennai | Goa | Delhi | Kolkata

Facebook
Twitter
LinkedIn
YouTube
INSTAGRAM

Enter your keyword